Red Brick Finishing

خطوة استلام وحدتك على الطوب الأحمر هي بداية الحلم الحقيقي، وهي الأساس اللي بيتبنى عليه كل فخامة وراحة بيتك. في “تميز”، بنستلم معاك الوحدة من الصفر ونتولى هندسة وتأسيس كل مرحلة بدقة تامة لضمان بنية تحتية صلبة لا تعاني من أي مشاكل مستقبلاً.

 

Why is the Red Brick Stage the Most Important Finishing Phase?

Because it includes hidden installations like plumbing and drainage works, electrical and internet conduit layouts, waterproofing and thermal insulation, and wall plastering. We manage this phase with the highest engineering standards and precision to ensure the structural safety of the building and technical cleanliness before we begin final decorations.

 

  • Strong engineering foundation: Plumbing and electrical networks matching the highest standards of safety and quality.
  • Complete waterproofing and thermal insulation: Full protection for your unit against humidity and water leaks.
  • Precise plastering and rendering: Complete squaring of walls and corners with professional engineering adjustment.
  • Inspection and testing checks: Pipe pressure testing and load securing before final finishing.

We save you the hassle of dealing with complex installations and craftsmen, and we deliver your unit completely ready for the decor and painting stage while you are at peak comfort and peace of mind, confident in every hidden detail behind the walls and floors.

 

Some FAQs

What is the first step you take when receiving an apartment at the red brick stage?

We start by taking accurate engineering dimensions, conducting a full field inspection to study the structural condition, and preparing layout blueprints for electricity and plumbing.

Does the red brick stage include complete insulation works?

Yes, we perform complete waterproofing and thermal insulation for bathrooms, kitchens, and roofs using the finest approved materials to ensure no future leaks occur.

How do you ensure the quality of hidden installations inside walls and floors?

We rely on specialized engineers to conduct pressure tests for pipes and electrical load tests before closing them with plaster to ensure 100% efficiency.

Contact Us

Contact Us & Start Your Project

Let's Bring Your Vision to Life

info@AZ-Design

Fifth Settlement, Cairo, Egypt

Connect with Expert Engineering Support

    tamyaoz.tutx-eg.com tamyaoz.tutx-eg.com